To conventionally start executing the proposal, the time allotted for the management plan is going to be a year and a half. That period of time would be designated for the expansion of roads, inclusion of the biker and motorist lanes, the production of speed bumps and other installations of traffic devices as well as physical features. The implication of the proposal will start at October 27, 2015 to be able to assemble allnecessary materials needed, and the duration of execution will roughly end at May 18, 2016. Careful examination must observed to gather all possible data from the flow of thetraffic management. Our proposed budget will be a total of 10,000,000 pesos for the following expenses: widening of roads, hiring of the well trained enforcers, installation of new equipments such as new traffic lights, 5 professional cctv cameras (which cost around 14k each), speed bumps, speed radars for traffic enforcers to use (which will cost around 32k), and the addition of the new lanes for the motorcycles/bicycles. For our proposal to run smoothly, we must get the approval of both the homeowner association and the local government. Aside from that,rigorously needed for affluent results.